A soldier pile wall had to be installed to support the road.
The roofs have dark tiles. The roof insulation is installed between the rafters to ensure that the top floor does not become too warm. The carpenter constructed the supporting structure.
The building was equipped with a combination of gas central heating and an air source heat pump.
The double skin method was used for the dry wall construction. F90 class materials were used for boxing in.
To protect your personal information, the connection to YouTube has been blocked. When you play this embedded video, you agree to the use of cookies by YouTube. For more information, see the privacy policy of YouTube.